Physical production sub-station projects: projects three-dimensional objects using a catalog of equipment, the use of three-dimensional tool for basic network design, lightning protection, analysis and cables.Create intelligent models: focus on the design process of a smart model rather than a set of separate design. Creating a three-dimensional model of a database intelligent objects.
#Neplan downloadly.ir software#
Increases in construction and operation speed by sharing three-dimensional model generated in software Bentley.Features and amenities Bentley Substation: Shipping information at any time in the two types of reports: graphical and tabular. Graphical reports include schematic designs and single-line diagram is. Microsoft Excel table from standard reporting mechanisms and linking the project to the database. All data is created automatically and directlyīentley Substation software to design electrical sub-station is. With this software, you can pay up to 40 percent faster production and design lets you combine the electrical and physical design. The features of this software can be used to avoid duplication, reducing errors, increasing collaboration with related drawing three-dimensional layout of electrical noted.Recovery time from Intergraph Smart 3D electrical equipment list.
#Neplan downloadly.ir code#
Support of the National Electrical Code (NEC).Defining the properties of their respective projects coordinated between the cables and cords reference.Replacing a single core cables in cable.Electricity generated multiple items in categories.
![neplan downloadly.ir neplan downloadly.ir](https://www.researchgate.net/profile/Sandra-Tellez-Gutierrez-2/publication/308584114/figure/fig2/AS:410040881172491@1474772772903/Electric-circuit-of-the-campus-in-NEPLANR.png)
![neplan downloadly.ir neplan downloadly.ir](https://demo.vdocuments.mx/img/378x509/reader024/reader/2020123010/55cf92c4550346f57b995fe3/r-1.jpg)